Job Description (JD)
Nama Program | Pemasangan dan Penyelenggaraan Tiga Fasa Pemanasan, Pengudaraan, Penyamanan Udara dan Penyejukbekuan (HVAC&R) [F432-008-3:2021] |
---|---|
Kod CU | F432-008-3:2021-C08 |
Competency | Core |
Tajuk CU | Perform three phase air-conditioning and refrigeration air-cooled equipment maintenance. |
Penerangan CU | Perform three phase air-conditioning and refrigeration air-cooled equipment maintenance describes the methodology of maintaining a three phase air conditioning air-cooled equipment including power & control wiring system, condensation water drainage system, refrigeration system, fittings & accessories in accordance with manufactures specification and authority requirements. The person who is competent in this CU should be able to maintain air-cooled equipment indoor fan motor, maintain air-cooled equipment evaporator/ cooling coil, maintain air-cooled equipment wiring control system, maintain air-cooled equipment metering devices, maintain electronic defroster, maintain air-cooled equipment drainage system, maintain air-cooled equipment outdoor fan motor, maintain air-cooled refrigerant performance, maintain air-cooled piping system, maintain three phase air-cooled compressor, maintain air-cooled condenser and record three phase air-conditioning and refrigeration air-cooled maintenance activities. The outcome of this CU is to equipment condition optimised, safety equipment functioned and performance optimised in accordance with manufacturer specification and authority requirements. |
Tempoh Latihan | 360 |
Objektif Pembelajaran | The learning outcomes of this competency are to enable the trainees to optimise equipment condition and observe safety equipment functioned and performance in accordance with manufacturer specification and authority requirements. Upon completion of this competency unit, trainees should be able to: 1. Maintain air-cooled equipment indoor fan motor. 2. Maintain air-cooled equipment evaporator/ cooling coil. 3. Maintain air-cooled equipment wiring control system. 4. Maintain air-cooled equipment metering devices. 5. Maintain electronic defroster. 6. Maintain air-cooled equipment drainage system. 7. Maintain air-cooled equipment outdoor fan motor. 8. Maintain air-cooled refrigerant performance. 9. Maintain air-cooled piping system. 10. Maintain three phase air-cooled compressor. 11. Maintain air-cooled condenser. 12. Record three phase air- conditioning air-cooled maintenance activities. |
Pra-Syarat | Not available. |