Job Description (JD)
Nama Program | Pemasangan dan Penyelenggaraan Tiga Fasa Pemanasan, Pengudaraan, Penyamanan Udara dan Penyejukbekuan (HVAC&R) [F432-008-3:2021] |
---|---|
Kod CU | F432-008-3:2021-C09 |
Competency | Core |
Tajuk CU | Perform three phase air-conditioning water-cooled equipment maintenance. |
Penerangan CU | Perform three phase air-conditioning water-cooled equipment maintenance describes the methodology of maintaining a three phase air conditioning air cool water cool equipment including power & control wiring system, condensation water drainage system, refrigeration system, fittings & accessories in accordance with manufactures specification and authority requirements. The person who is competent in this CU should be able to maintain water-cooled equipment indoor fan motor, maintain water-cooled equipment evaporator/ cooling coil, maintain water-cooled equipment wiring control system, maintain water-cooled equipment metering devices, maintain water-cooled equipment drainage system, maintain cooling tower, maintain water-cooled refrigerant performance, maintain water-cooled piping system, maintain three phase water-cooled compressor, maintain water-cooled condenser, maintain water pump and record three phase air-conditioning water-cooled maintenance activities. The outcome of this CU is to equipment condition optimised, safety equipment functioned and performance optimised in accordance with manufacturer specification and authority requirements. |
Tempoh Latihan | 360 |
Objektif Pembelajaran | The learning outcomes of this competency are to enable the trainees to optimise equipment condition and observe safety equipment functioned and performance in accordance with manufacturer specification and authority requirements. Upon completion of this competency unit, trainees should be able to: 1. Maintain water-cooled equipment indoor fan motor. 2. Maintain water-cooled equipment evaporator/ cooling coil. 3. Maintain water-cooled equipment wiring control system. 4. Maintain water-cooled equipment metering devices. 5. Maintain water-cooled equipment drainage system. 6. Maintain cooling tower. 7. Maintain water-cooled refrigerant performance. 8. Maintain water-cooled piping system. 9. Maintain three phase water-cooled compressor. 10. Maintain water-cooled condenser. 11. Maintain water pump. 12. Record three phase air-conditioning water-cooled maintenance activities. |
Pra-Syarat | Not available. |