Job Description (JD)
Nama Program | Pemasangan dan Penyelenggaraan Sistem Solar Photovoltaic (PV) [F432-009-2:2021] |
---|---|
Kod CU | F432-009-2:2021-C04 |
Competency | Core |
Tajuk CU | Perform Balance of System (BOS) installation. |
Penerangan CU | Perform Balance of System (BOS) installation describes the methods on how to mount, install and arrange the Balance of System Components as per relevant standards and practice in the industry. The BOS components comprise of on-grid and off-grid application such as Array Junction Box, PV Inverter, AC Junction Box, DC & AC cables, Cable Management System as well as Battery Management System. The person who is competent in this CU should be able to identify Balance of System (BOS) installation requirement, prepare Balance of System (BOS) installation work area and install Balance of System (BOS) components. The outcome of this CU is installation of BOS components in an orderly manner, quality of the installation, complies with the required standards in the industry and the BOS components operate at optimum performance in accordance with the requirements and specifications of the construction drawings. |
Tempoh Latihan | 360 |
Objektif Pembelajaran | The learning outcomes of this competency are installation of BOS components in an orderly manner, quality of the installation, complies with the required standards in the industry and the BOS components operate at optimum performance in accordance with the requirements and specifications of the construction drawings Upon completion of this competency unit, trainees should be able to: 1. Identify Balance of System (BOS) installation requirement. 2. Prepare Balance of System (BOS) installation work area. 3. Install Balance of System (BOS) components. |
Pra-Syarat | NOT AVAILABLE |