Job Description (JD)
Nama Program | PERANCANGAN & REKABENTUK INFRASTRUKTUR AIR [E360-008-5:2024] |
---|---|
Kod CU | E360-008-5:2024-C02 |
Competency | Core |
Tajuk CU | PERFORM WATER RESOURCE WORK DESIGN |
Penerangan CU | Perform water resource work design describes competencies in determining the catchment area plan and water quality requirement, intake location prior to concluding the water resource work design. The person who is competent in this CU should be able to evaluate water catchment area plan, evaluate raw water quality treatment, evaluate water intake location and produce water resource work design report. The outcome of this CU is an accurate, reliable, and comprehensive water resources work design according to water quality standard and design requirements. |
Tempoh Latihan | 80 |
Objektif Pembelajaran | The learning outcomes of this competency are to enable the trainees to perform water resource work design according to water quality standard and design requirements. Upon completion of this competency unit, trainees should be able to: 1. Evaluate water catchment area plan. 2. Evaluate raw water quality treatment. 3. Evaluate water intake location. 4. Produce water resource work design report. |
Pra-Syarat | Not available. |