Job Description (JD)
Nama Program | PERANCANGAN & REKABENTUK INFRASTRUKTUR AIR [E360-008-5:2024] |
---|---|
Kod CU | E360-008-5:2024-C05 |
Competency | Core |
Tajuk CU | PERFORM NEW DEVELOPMENT WATER SUPPLY APPLICATION VALIDATION |
Penerangan CU | Perform new development water supply application validation describes competencies in finalising preliminary and detailed designs and managing pipe connection application and asset handing over documentations. The person who is competent in this CU should be able to validate water distribution system preliminary design, validate water distribution system detailed design, approve new development water pipe connection application and approve handing over water asset documentation. The outcome of this CU is an accurate, reliable, and comprehensive preliminary designs and documentation produced according to SOP.= |
Tempoh Latihan | 80 |
Objektif Pembelajaran | The learning outcomes of this competency are to enable the trainees to perform new development water supply application validation according to SOP. Upon completion of this competency unit, trainees should be able to: 1. Validate water distribution system preliminary design. 2. Validate water distribution system detailed design. 3. Approve new development water pipe connection application 4. Approve handing over water asset documentation. |
Pra-Syarat | Competent in E360-008-5:2024-C01-Plan Water Infrastructure Development. Competent in E360-008-5:2024-C02-Perform Water Resource Work Design. Competent in E360-008-5:2024-C03-Perform Water Treatment Work Design. Competent in E360-008-5:2024-C04-Perform Water Distribution Network Design. |