Job Description (JD)
Nama Program | Pemasangan Instrumen (Minyak & Gas) [OG-027-2:2014] |
---|---|
Kod CU | OG-027-2:2014-C04 |
Competency | Core |
Tajuk CU | FIELD INSTRUMENT EQUIPMENT INSTALLATION |
Penerangan CU | Field instrument equipment installation activity is the competency to install instrument’s equipment at site in accordance with technical drawing requirement and relevant rules and regulation. The person who is competent in this CU shall be able to identify field instrument equipment installation requirement, prepare instrument tools, equipment and materials, install field instrument equipment and remove instrument equipment The outcome of this competency is to ensure instrumentation equipment installation activity is carried out effectively and efficiently. |
Tempoh Latihan | 200 |
Objektif Pembelajaran | - |
Pra-Syarat | 0 |