Nama ProgramPemasangan & Penyelenggaraan Sistem Pemantauan Maritim [DS-015-2:2014]
Kod CUDS-015-2:2014-E03
CompetencyElektif
Tajuk CULIGHTNING PROTECTION SYSTEMINSTALLATION AND MAINTENANCE
Penerangan CULPS is a system used on electrical power systems and telecommunications systems to protect the insulation and conductors of the system from the damaging effects of lightning. The typical lightning arrester has a high-voltage terminal and a ground terminal. When a lightning surge (or switching surge, which is very similar) travels along the power line to the arrester, the current from the surge is diverted through the arrestor, in most cases to earth . Principally, LPS consists of; Lightning Arrestor Pole and Bracket, Active Lightning Rod/Electrode Rod, Ground Strip Wire/Conductor, Earthing Link Chambers and Surge Protector as well as their associated equipment.

LPS Components installation is fixing or semi-fixing of a complete LPS or a self-contained LPS Components, with its accompanying assemblies, accessories and parts. LPS Components installation also includes provision of or connection to services (such as power) or other associated equipment required to make the installed LPS Components ready for operations . LPS Components are installed Static Platforms (Land-based and Off-shore).

Preventive Maintenance is designed to preserve and restore LPS reliability by replacing worn components before they actually fail. Preventive Maintenance activities include care and servicing for the purpose of maintaining LPS as well as their associated equipment in satisfactory operating condition by providing for systematic check, detection, and correction of incipient failures either before they occur or before they develop into major defects. Preventive Maintenance include tests, measurements, adjustments, and parts replacement, performed specifically to prevent faults from occurring, partial or complete overhauls, oil changes, lubrication and so on at specified periods. In addition, persons can record equipment deterioration so they know to replace or repair worn parts before they cause system failure .

Persons who are competent in this CU shall be able to install a complete LPS as well as their associated equipment. He or She shall also be able to carry out Preventive Maintenance on LPS Components as well as their associated equipment in accordance with Regulatory Bodies’ recommendations, OEM’s/Client’s requirements and Contractor’s SOP.
Tempoh Latihan72
Objektif PembelajaranPersons who are competent in this CU shall be able to install a complete LPS as well as their associated
equipment. He or She shall also be able to carry out preventive maintenance on LPS Components as well as their
associated equipment. Upon completion of this CU, trainees will be able to:-
· Set up LPS installation.
· Install LPS Components.
· Perform LPS Components preventive maintenance.
Pra-Syarat0