Job Description (JD)
Nama Program | Tunnel Construction [BC-065-3:2014] |
---|---|
Kod CU | BC-065-3:2014-C04 |
Competency | Core |
Tajuk CU | TUNNELLING TESTING WORKS |
Penerangan CU | Tunnelling testing works is a crucial step in ensuring that all set-up/ systems are functioning properly. Tunnelling testing set-up/ system involves a series of steps that are taken to prove that the system meets the specified requirements. The person who is competent in tunnelling testing works must be able to identify testing requirement, perform tunnelling testing works and report tunnelling testing works in accordance with Standard Operating Procedure (SOP). The outcome of this competency is to ensure properly test and troubleshoot any set-up/ system in accordance with Standard Operating Procedure (SOP) and Tunnel Construction Plan (TCP). |
Tempoh Latihan | 0 |
Objektif Pembelajaran | The person who is competent in this CU shall be able to ensure properly test and troubleshoot any set-up/ system in accordance with Standard Operating Procedure (SOP). Upon completion of this competency unit, trainees will be able to: - • Identify tunnelling testing requirement. • Perform tunnelling testing works. • Report tunnelling testing and commissioning works. |
Pra-Syarat | Based on the workshop findings, it is decided that the minimum requirements for those interested to enrol in this course areas below:i. Sijil Pelajaran Malaysia (SPM) or ii. Penilaian Menengah Rendah (PMR) with 5 years working experience |