Job Description (JD)
Nama Program | PENYELIAAN PEMASANGAN RETIKULASI AIR [F432-004-3:2018] |
---|---|
Kod CU | F432-004-3:2018-C02 |
Competency | Core |
Tajuk CU | Water Reticulation Work Inspection |
Penerangan CU | Water reticulation work inspection describes the competency in performing inspection on water reticulation pipe work A competent person in this CU shall be able to verify pipe handling work, verify pipe laying work, verify valve installation, verify pipe specials installation, verify fire hydrant installation, verify water reticulation connection, verify chamber installation and construction, verify thrust and anchor block construction, verify marker post, verify flow meter installation and verify testing result The outcome of this competency is to The outcome of this competency is to ensure that all works are in compliance with Occupational Safety And Health Act (OSHA) requirement, Standard Operating Procedure (SOP) and Uniform Technical Guideline (UTG) |
Tempoh Latihan | 168 |
Objektif Pembelajaran | The person who is competent in this CU shall be able to ensure that all works are in compliance with Occupational Safety And Health Act (OSHA) requirement, Standard Operating Procedure (SOP) and Uniform Technical Guideline (UTG). Upon completion of this competency units, trainees will be able to:- 1. Verify pipe handling work 2. Verify pipe laying and jointing work 3. Verify valve installation 4. Verify pipe specials installation 5. Verify fire hydrant installation 6. Verify water reticulation connection 7. Verify chamber installation and construction 8. Verify thrust and anchor block construction 9. Verify marker post 10. Verify flow meter installation 11. Verify pipe testing result |
Pra-Syarat | 0 |