Job Description (JD)
Nama Program | Aplikasi Kejuruteraan Industri Pengeluaran Pakaian [C141-002-3:2017] |
---|---|
Kod CU | C141-002-3:2017-C04 |
Competency | Core |
Tajuk CU | Apparel Production Line Layout Improvement |
Penerangan CU | Apparel Production Line Layout Improvement describes the competencies required to design production line layout based on critical examination of production flow and application of principles of motion economy and other relevant techniques. The person who is competent in this CU shall be able to record and examine current apparel production line layout, propose improved production line layout design, material and storage handling equipment, and install and maintain improved production line layout. The outcome of this competency is more efficient and cost effective production line layout that will bring about increased productivity and profitability to the company. |
Tempoh Latihan | 160 |
Objektif Pembelajaran | The person who is competent in this CU shall be able to design efficient and cost-effective production line layout based on critical examination of production flow and application of principles of motion economy and other relevant techniques. Upon completion of this competency unit, trainees will be able to:- 1. Determine apparel production line layout improvement requirements 2. Record current apparel production line layout 3. Examine current apparel production line layout 4. Propose new apparel production line layout design 5. Propose material handling and storage equipment 6. Install and maintain improved apparel production line layout |
Pra-Syarat | Apparel Production Standard Method Development and Improvement, Apparel Production Standard Time Development and Improvement, Apparel Production Line Balancing Development and Improvement |