Job Description (JD)
Nama Program | LOW TENSION OVERHEAD INSTALLATION [EE-211-1:2012] |
---|---|
Kod CU | EE-211-1:2012-C03 |
Competency | Core |
Tajuk CU | Pre-assembly LT Overhead Works |
Penerangan CU | The CU title describes the competency in Pre-assembly Overhead works. He/she is responsible in assembling stay binding, pole joining and pole top accessories as per specification. The personnel who are competent in this CU shall be able to assemble overhead stay binding, assemble pole joining and assemble pole top accessories. The outcome of this competency is pre assembly works are done according to Standard Operating Procedure (SOP) and Construction Manuals. |
Tempoh Latihan | 142 |
Objektif Pembelajaran | The person who is competent in this CU shall be able to carry out pre-assembly overhead works according to requirement. Upon completion of this competency unit trainees will be able to:- 1. Assemble overhead stay binding 2. Assemble pole joining 3. Assemble pole top accessories |
Pra-Syarat | 0 |