Job Description (JD)
Nama Program | LOW TENSION OVERHEAD INSTALLATION & OPERATION [EE-211-2:2012] |
---|---|
Kod CU | EE-211-2:2012-C05 |
Competency | Core |
Tajuk CU | Earthing & Bonding System |
Penerangan CU | The CU title describes the competency in earthing & bonding system. He/she is responsible in identifying, and installing and testing of earthing & bonding system as per specification. The personnel who are competent in this CU shall be able to identify earthing and bonding system, install guard wire, install earthing conductor & electrode, install bonding wire and perform earth test. The outcome of this competency is earthing & bonding system are installed and functioning according to specifications and construction manuals. |
Tempoh Latihan | 120 |
Objektif Pembelajaran | The person who is competent in this CU shall be able to earthing & bonding system installation according specification and manual. Upon completion of this competency unit trainees will be able to:- 1. Identify earthing and bonding system 2. Install guard wire 3. Install earthing conductor and electrode 4. Install bonding wire |
Pra-Syarat | 0 |