Job Description (JD)
Nama Program | Pemasangan & Penyelenggaraan Fiber Optik - Telekomunikasi [EE-324-3:2013] |
---|---|
Kod CU | EE-324-3:2013-C02 |
Competency | Core |
Tajuk CU | FIBRE OPTIC CABLE NETWORK OUTSIDE PLANT (OSP) INSTALLATION |
Penerangan CU | Fibre optic cable may be installed outside or inside a plant using several different installation processes. OSP may be direct buried, pulled or blown into conduit or inner duct, or installed aerially between poles. The fibre optic cables are installed outside of customer’s premises. The installation process will depend on the nature of the installation and the type of cable being used. The person who is competent in this CU shall be able to arrange fibre optic cable network OSP installation resources, barricade working area, inspect duct way availability for underground installation and perform underground and overhead installation cable pulling in accordance with installation guidelines and Occupational Safety and Health Act (OSHA) requirements. Particular care should be taken during OSP installation to prevent kinking the cable which can harm the fibres. |
Tempoh Latihan | 450 |
Objektif Pembelajaran | The person who is competent in this CU shall be able to ensure the OSP cables are installed properly without harming the fibres. Upon completion of this competency unit, trainees will be able to: - Arrange fibre optic cable network Outside Plant (OSP) installation resources Barricade working area Inspect duct way availability for underground installation Perform underground installation cable pulling Perform overhead installation fibre optic cable pulling |
Pra-Syarat | 0 |