Job Description (JD)
Nama Program | Pemasangan & Penyelenggaraan Fiber Optik - Telekomunikasi [EE-324-3:2013] |
---|---|
Kod CU | EE-324-3:2013-C03 |
Competency | Core |
Tajuk CU | FIBRE OPTIC CABLE NETWORK INSIDE PLANT (ISP) INSTALLATION |
Penerangan CU | ISP cables can be installed in raceways, cable trays above ceilings or under floors, placed in hangers, pulled into conduit or inner-duct. The fibre optic cables are installed inside of customer’s premises. The installation process will depend on the nature of the installation and the type of cables being used. The person who is competent in this CU shall be able to arrange fibre optic cable network ISP installation resources, barricade working area, inspect cable trunking and tray availability and perform fibre optic cable pulling in accordance with installation guidelines and OSHA requirements. Particular care should be taken during installation to prevent kinking the cable which can harm the fibres. |
Tempoh Latihan | 270 |
Objektif Pembelajaran | The person who is competent in this CU shall be able to ensure the ISP cables are installed properly without harming the fibres. Upon completion of this competency unit, trainees will be able to: - Arrange fibre optic cable network Inside Plant (ISP) installation resources Barricade working area Inspect cable trunking and tray availability Perform fibre optic cable pulling |
Pra-Syarat | 0 |