Job Description (JD)
Nama Program | Operasi & Penyelenggaraan Instrumentasi Perindustrian & Kawalan [EE-230-3:2013] |
---|---|
Kod CU | EE-230-3:2013-C03 |
Competency | Core |
Tajuk CU | INSTRUMENTATION & CONTROL PRE-COMMISSIONING PREPARATION |
Penerangan CU | Instrument & control pre-commissioning preparation can be defined as the process of assuring that all systems and components are installed, tested, operated and accessibility according to the operational requirements of the owner or final client. The person who is competent in this Competency Unit shall be able to interpret instrument & control pre-commissioning requirement, perform instrument installation, perform instrument pre-commissioning, assess installed instrument operational performance and prepare instrument pre-commissioning report. The outcome of this competency is to ensure that the instrument & control pre-commissioning preparation activities are performed in accordance to operating and maintenance manual. |
Tempoh Latihan | 270 |
Objektif Pembelajaran | The person who competent in this CU shall be able to ensure the instrument & control pre-commissioning preparation activities are performed according to operating and maintenance manual. Upon completion of this competency unit, trainees will be able to:- Interpret instrument & control pre-commissioning requirements Perform instrument installation Perform instrument pre-commissioning Assess installed instrument operational performance Prepare instrument pre-commissioning report |
Pra-Syarat | 0 |