Job Description (JD)
Nama Program | Pengurusan Pemeriksaan Letupan& Penyalutan [OG-023-5:2013] |
---|---|
Kod CU | OG-023-5:2013-C01 |
Competency | Core |
Tajuk CU | Blasting & Coating Inspection Quality System Management |
Penerangan CU | Blasting & coating inspection is the quality control and assurance process of ensuring that the quality of blasting & coating works produced meet specifications and comply with project requirements. In order to perform this function, the inspection process itself must comply with specified standards. Blasting & coating inspection quality system management refers to the process of ensuring that inspection works comply with established blasting & coating standards and client requirements. The person who is competent in this CU will be able to identify blasting & coating standards, establish inspection quality and standards procedure, inspection test plan and inspection documents, and prepare quality manual. The outcome of this competency is to ensure that blasting & coating inspection procedures are established based on international blasting & coating standards and client requirements |
Tempoh Latihan | 300 |
Objektif Pembelajaran | The person who is competent in this CU shall be able to control blasting & coating inspection quality compliance in accordance with blasting & coating standards and client requirements. Upon completion of this competency unit, trainees will be able to:- • Id entify blasting & coating inspection standards and specifications as per client requirements • Es tablish quality standards and procedure • Es tablish ITP • Es tablish inspection documents •Pr epare quality manual |
Pra-Syarat | 0 |