Job Description (JD)
Nama Program | Penyeliaan Teknikal Pengeluaran Semikonduktor (Proses Bahagian Belakang) [EE-020-4:2013] |
---|---|
Kod CU | EE-020-4:2013-C01 |
Competency | Core |
Tajuk CU | EQUIPMENT SET UP AND START UP COMMISSIONING |
Penerangan CU | The Equipment Set Up And Start Up Management competency unit is to manage the set up and start- up of equipment to specified required capacity in performing the semiconductor manufacturing process in the production line as well as to ensure it sustains to accomplish a designated job functions / work load as scheduled in accordance with respective standard requirements. The Semiconductor Manufacturing Supervisor is responsible to analyse equipment capacity and to study available resources so as to accept / buy off equipment required for carrying out designated job functions / work load in the production line as well as preparing of relevant documentation for commissioning in accordance with commissioning requirements and Standard Operating Procedure |
Tempoh Latihan | 200 |
Objektif Pembelajaran | The trainee who is competent in this competency unit is to commission the set up and start- up of equipment to specified required capacity in performing the semiconductor manufacturing process in the production line as well as to ensure it sustains to accomplish a designated job functions / work load as scheduled in accordance with respective standard requirements. Upon completion of this competency unit, trainees will be able to:- · Analyse Equipment Capacity, Capability And Functionality · Study Resources (Human, Materials, Tools And Kits) For Equipment Capacity, Capability And Functionality · Plan Equipment Set Up And Commissioning · Carry Out Equipment Acceptance And Buy Off For Set Up And Commissioning · Prepare Equipment Set Up And Commissioning Reports |
Pra-Syarat | 0 |