Job Description (JD)
Nama Program | Pengurusan Rekabentuk, Pemasangan & Penyelenggaraan HVAC [ME-020-5:2012] |
---|---|
Kod CU | ME-020-5:2012-C05 |
Competency | Core |
Tajuk CU | HVAC HANDING OVER PROCESS MANAGEMENT |
Penerangan CU | HVAC handing over process management focuses on managing and reviewing post-construction documentations i.e. as-built drawing, test result, operation manual, local authority inspection, warranty certificate, catalogue, conducting DefectLiability Period (DLP) inspection and final claim. |
Tempoh Latihan | 290 |
Objektif Pembelajaran | 0 |
Pra-Syarat | 0 |