Job Description (JD)
Nama Program | Rekabentuk Perpaipan ( Minyak & Gas) [OG-022-4:2013] |
---|---|
Kod CU | OG-022-4:2013-C06 |
Competency | Core |
Tajuk CU | PIPING MATERIALS MANAGEMENT |
Penerangan CU | Piping Materials Management competency unit is to develop list of materials with quantities and descriptions (such as specific grades of steel) that are required to build the piping system. This list is generated by analysis of P&ID and piping drawing document. Material take off also includes the amount, and the weight of the items taken off. This is important when dealing with big projects, allowing the company to determine total weight of the take-off item and how best to move the item (if necessary) when construction is completed. Piping Designer is responsible to analyse the drawings and determine all the materials required to accomplish the design as per project / design specification requirements. In doing so, he / she shall be able to prepare materials catalogue, verify piping classes and other details specification as per isometric drawing details in order to create a bill of materials (BOM) for procurement and requisition purposes in accordance with Company Operating Procedure (COP). The outcome of this competency the piping designer will be able to produce material take-off list for procurement of materials. |
Tempoh Latihan | 120 |
Objektif Pembelajaran | Piping Materials Management competency unit is to develop list of materials with quantities and types (such as specific grades of steel) that are required to build a designed structure or item. This list is generated by analysis of a blueprint or other design document. Material take off also includes the amount, and the weight of the items taken off. This is important when dealing with larger structures, allowing the company that does the take off to determine total weight of the item and how best to move the item (if necessary) when construction is completed. Upon completion of this competency unit, trainees will be able to:- · Analyse piping materials preparation requirements · Verify material take-off · Produce material take-off list for procurement of materials |
Pra-Syarat | 0 |