Job Description (JD)
Nama Program | Operasi Fabrikasi Paip(Minyak, Gas & Petrokimia) [OG-010-3:2011] |
---|---|
Kod CU | OG-010-3:2011-C02 |
Competency | Core |
Tajuk CU | PIPING FABRICATION WORK PREPARATION |
Penerangan CU | Piping Fabrication Work Preparation is a process to prepare resources required for a pipe spool production according to Isometric drawing |
Tempoh Latihan | 84 |
Objektif Pembelajaran | 0 |
Pra-Syarat | 0 |