Job Description (JD)
Nama Program | Pemasangan Instrumen (Minyak & Gas) [OG-027-3:2014] |
---|---|
Kod CU | OG-027-3:2014-C04 |
Competency | Core |
Tajuk CU | INSTRUMENT SYSTEM INSTALLATION QUALITY CONTROL |
Penerangan CU | Instrument system installation quality control describes the procedures and steps to ensure instrument quality complies with standard as specified by the equipment manufacturer specification. This activity involves carrying out instrument cable quality control, carrying out instrument equipment installation quality control and carrying out instrument operation documentation quality control The outcome of this competency is to ascertain the installation quality of the equipment meet the standard specified. It also entails the element of continuous improvement and systematic documentation. |
Tempoh Latihan | |
Objektif Pembelajaran | |
Pra-Syarat |