Job Description (JD)
Nama Program | Pemasangan Mekanikal (Minyak & Gas) [OG-028-3:2014] |
---|---|
Kod CU | OG-028-3:2014-C02 |
Competency | Core |
Tajuk CU | MECHANICAL EQUIPMENT PRE-COMMISSIONING PREPARATION |
Penerangan CU | Mechanical equipment pre-commissioning is a systematic process of ensuring the installed equipment works interactively according to the design intent and the operational needs. This activity involves identifying mechanical commissioning requirement, carrying out pre commissioning preparation and carrying out mechanical pre-commissioning activities The outcome of this competency is to ensure pre-commissioned of the mechanical is carried out as required prior commissioning. |
Tempoh Latihan | |
Objektif Pembelajaran | |
Pra-Syarat |