Job Description (JD)
Nama Program | Koordinasi Pemasangan & Penyelenggaraan Sistem Pemantauan Maritim [DS-015-4:2014] |
---|---|
Kod CU | DS-015-4:2014-C03 |
Competency | Core |
Tajuk CU | MSS COMMISSIONING COORDINATION |
Penerangan CU | MSS Commissioning Coordination describes the work activities that must be performed or coordinated after the system is put in place and the necessary test has been carried out. These activities in general include producing a series of systematic procedures or processes to perform the testing, coordinating a variety of tests on MS main equipment and sub-system or sub-assembly to verify functionality or to identify problems and generating specific report. Persons who are competent in this CU shall be able to produce a series of systematic procedures or processes to perform the testing, coordinating a variety of tests on MS main equipment and sub-system or sub-assembly and generating specific report for future undertaking or activities in accordance with MSS and Associated Equipment FAT Procedures or Checklists and OEM’s Test Manuals or Specifications. The outcome of this CU is person that shall be able to provide excellent and quality MSS Commissioning Coordination to ensure prompt action taken and customer satisfaction guaranteed. |
Tempoh Latihan | 192 |
Objektif Pembelajaran | Persons who are competent in this CU shall be able to produce a series of systematic procedures or processes to perform the testing, coordinating a variety of tests on MS main equipment and sub-system or sub-assembly and generating specific report for future undertaking or activities. Upon completion of this CU, trainees will be able to:- · Produce MSS and Associated Equipment Final Acceptance Test (FAT) Checklists. · Coordinate MSS and Associated Equipment Final Acceptance Trial (FAT) Session. · Generate MSS and Associated Equipment Commissioning Report. |
Pra-Syarat | 0 |