JOB DESCRIPTION

Job Description (JD)

Nama ProgramBAGGAGE HANDLING SYSTEM OPERATION & MAINTENANCE SERVICES [TP-802-3:2013]
Kod CUTP-802-3:2013-C05
CompetencyCore
Tajuk CUBAGGAGE CONVEYORSYSTEM MAINTENANCE
Penerangan CUBaggage Conveyor System
Maintenance is a process to
maintain conveyor system which
is consist Mechanical and
Electrical (M&E) Preventive and
Corrective Maintenance using
specific and special tools.
The person who is competent in
Baggage Conveyor System
Maintenance shall be able to
prepare conveyor system
maintenance requirements,
perform conveyor mechanical
preventive maintenance, perform
conveyor mechanical corrective
maintenance, perform conveyor
electrical preventive maintenance
and perform conveyor electrical
corrective maintenance in
accordance with Original
Equipment Manufacturer’s
Mechanical & Electrical Manual
and Work Instruction
The Preventive and Corrective
Conveyor System Maintenance
activity is locate at Main Terminal
and Satellite Building.
The activity of Conveyor System
Maintenance is applicable
according to Maintenance Plan The outcome of this CU is to
obtain conveyor speed accuracy
and full system service
functionality In accordance with
original equipment manufacturer
(OEM) specification.
Tempoh Latihan160
Objektif PembelajaranThe outcome of this competency unit enables the person to sustain baggage delivery at designated point, timely,
safely and securely in accordance with airport standard.
Upon completion of this competency unit trainees will be able to:
· plan baggage arrival destination
· monitor baggage off-loading
· monitor Arrival Baggage flow
· investigate late delivery arrival baggage
Pra-Syarat-