Nama Program | LOW TENSION OVERHEAD INSTALLATION, OPERATION & MAINTENANCE [EE-211-3:2012] |
---|---|
Kod CU | EE-211-3:2012-C03 |
Competency | Core |
Tajuk CU | LT Overhead Line Protection System Installation |
Penerangan CU | The CU title describes the competency in LT Overhead Line Protection System Installation He/she is responsible in preparing, installing, testing and commissioning protection system as per specification. The personnel who are competent in this CU shall be able to prepare protection system, install protection system devices and perform electrical protection system testing and commissioning. The outcome of this competency is LT overhead line protection systems are fixed and functioning according to Standard Operating Procedure (SOP) and manuals. |
Tempoh Latihan | 180 |
Objektif Pembelajaran | The person who is competent in this CU shall be able to carry out LT protection system installation according to specifications and manuals.Upon completion of this competency unit trainees will be able to:- 1) Prepare protection system 2) Install protection device system 3) Perform protection device testing and commissioning |
Pra-Syarat | 0 |