Competency Profile Chart (CPC)
Memaparkan 2,081-2,100 daripada 12,857 items.
Bil | Competency | Tajuk Competency Unit (CU) | Lihat Terperinci |
---|---|---|---|
2081 | Elektif | INTERMEDIATE GROUND COMMUNICATION | Job Description (JD) |
2082 | Core | PIPING FABRICATION MATERIAL PREPARATION | Job Description (JD) |
2083 | Core | PIPE CUTTING WORK HANDLING | Job Description (JD) |
2084 | Core | PIPE JOINTING (FIT UP) | Job Description (JD) |
2085 | Core | PIPE SUPPORT FABRICATION | Job Description (JD) |
2086 | Core | PIPE FITTING ADMINISTRATIVE FUNCTION | Job Description (JD) |
2087 | Core | PIPING FABRICATION WORK PREPARATION | Job Description (JD) |
2088 | Core | PIPE FIT UP INSPECTION | Job Description (JD) |
2089 | Core | PIPE SPOOL FINAL INSPECTION | Job Description (JD) |
2090 | Core | PIPE FABRICATION SAFETY MONITORING | Job Description (JD) |
2091 | Core | COMPOSITE PRODUCTION PROCESS COORDINATION | Job Description (JD) |
2092 | Core | COMPOSITE PRODUCTION QUALITY CONTROL | Job Description (JD) |
2093 | Core | COMPOSITE TOOLING AND EQUIPMENT MAINTENANCE | Job Description (JD) |
2094 | Core | COMPOSITE PRODUCTION PROCESS CONTROL | Job Description (JD) |
2095 | Core | COMPOSITE PRODUCTION TECHNICAL SKILL DEVELOPMENT | Job Description (JD) |
2096 | Core | COMPOSITETECHNICAL DOCUMENTATION CONTROL | Job Description (JD) |
2097 | Core | COMPOSITE PRODUCT FORMULATION | Job Description (JD) |
2098 | Core | COMPOSITE MATERIAL PREPARATION | Job Description (JD) |
2099 | Core | COMPOSITE MOULD/TOOLING PREPARATION | Job Description (JD) |
2100 | Core | COMPOSITE PRODUCT FORMING PROCESS(OPEN MOULD) | Job Description (JD) |