Competency Profile Chart (CPC)
Memaparkan 1,721-1,740 daripada 12,857 items.
Bil | Competency | Tajuk Competency Unit (CU) | Lihat Terperinci |
---|---|---|---|
1721 | Core | FINAL DOCUMENT PREPARATION | Job Description (JD) |
1722 | Core | TECHNICAL DOCUMENT ADMINISTRATION | Job Description (JD) |
1723 | Core | COMPOSITE PRODUCT FORMING (CONTINUOUS PROCESS) | Job Description (JD) |
1724 | Core | COMPOSITE PRODUCT FINAL INSPECTION | Job Description (JD) |
1725 | Core | COMPOSITE MOULD/TOOLING FABRICATION | Job Description (JD) |
1726 | Core | COMPOSITE OPERATION SUPERVISION | Job Description (JD) |
1727 | Core | COMPOSITE MATERIAL QUALITY CONTROL | Job Description (JD) |
1728 | Elektif | COMPOSITE PRODUCT REPAIR OPERATION | Job Description (JD) |
1729 | Elektif | COMPOSITE PRODUCT ASSEMBLY OPERATION | Job Description (JD) |
1730 | Core | COMPOSITE MOULD/TOOLING DESIGN DEVELOPMENT | Job Description (JD) |
1731 | Core | COMPOSITE PRODUCTION QUALITY ASSURANCE | Job Description (JD) |
1732 | Core | COMPOSITE PRODUCT RESEARCH AND DEVELOPMENT | Job Description (JD) |
1733 | Core | COMPOSITE PRODUCTIONBUDGET AND COST MANAGEMENT | Job Description (JD) |
1734 | Core | COMPOSITE PRODUCTION RESOURCE MANAGEMENT | Job Description (JD) |
1735 | Core | COMPOSITE PRODUCTION PLANNING AND CONTROL | Job Description (JD) |
1736 | Core | PLASTIC INJECTION MOULD DESIGN CONCEPT REALISATION | Job Description (JD) |
1737 | Core | PLASTIC INJECTION MOULD MANUFACTURING PROCESS OPTIMIZATION | Job Description (JD) |
1738 | Core | PLASTIC INJECTION MOULD MANUFACTRUING PROJECT MANAGEMENT | Job Description (JD) |
1739 | Core | PLASTIC INJECTION MOULD BUY-OFF MANAGEMENT | Job Description (JD) |
1740 | Core | PLASTIC INJECTION MOULD MANUFACTRUING BUSINESS DEVELOPMENT | Job Description (JD) |