Competency Profile Chart (CPC)
Memaparkan 1,961-1,980 daripada 12,857 items.
Bil | Competency | Tajuk Competency Unit (CU) | Lihat Terperinci |
---|---|---|---|
1961 | Core | ENERGY EMPOWERMENT CONSULTATION | Job Description (JD) |
1962 | Core | CRYSTAL HYDROTHERAPY | Job Description (JD) |
1963 | Core | SUBTLE BODIES ENERGY HEALING | Job Description (JD) |
1964 | Core | CRYSTAL BIO-ENERGY MOVEMENT HEALING | Job Description (JD) |
1965 | Core | CRYSTAL VIBRATIONAL THERAPY | Job Description (JD) |
1966 | Core | CRYSTAL HEALING CENTRE PRODUCTS & SERVICES RETAILING | Job Description (JD) |
1967 | Core | CRYSTAL HEALING CENTRE ADMINISTRATION | Job Description (JD) |
1968 | Elektif | ENERGY MEDICINE PRODUCTSE-MARKETING | Job Description (JD) |
1969 | Core | BOILER OPERATION | Job Description (JD) |
1970 | Core | BOILER PLANT MECHANICAL COMPONENT MAINTENANCE | Job Description (JD) |
1971 | Core | BOILER WATER/STEAM SIDE COMPONENT MAINTENANCE | Job Description (JD) |
1972 | Core | BOILER FIRESIDE (FURNACE) COMPONENT MAINTENANCE | Job Description (JD) |
1973 | Core | BOILER FLUE GAS SYSTEM COMPONENT MAINTENANCE | Job Description (JD) |
1974 | Core | BOILER INSTRUMENTATION CONTROL SYSTEM COMPONENT MAINTENANCE | Job Description (JD) |
1975 | Core | BOILER ELECTRICAL SYSTEM COMPONENT SERVICING | Job Description (JD) |
1976 | Core | BOILER FUEL PLANT EQUIPMENT MAINTENANCE | Job Description (JD) |
1977 | Core | BOILER WATER TREATMENT PLANT MAINTENANCE | Job Description (JD) |
1978 | Core | BOILER TESTING AND COMMISSIONING | Job Description (JD) |
1979 | Core | BOILER MAINTENANCE SUPERVISION | Job Description (JD) |
1980 | Elektif | TEMPORARY WORKING PLATFORM INSTALLATION | Job Description (JD) |